| City of Holdrege electric rate schedule | Effective June 1, 2007 | ||
| RESIDENTIAL | PARTIAL CONTROL IRRIGATION | ||
| Availability - This schedule is available within the corporate limits through a | Irrigation system will only be subject to interruptions during the hours of | ||
| single meter as a single phase secondary voltage for one-family residences | 10:00 am-10:00 pm (Mon-Sat) when City is in load control as directed by | ||
| or their equivalent for all residential uses of electric service. Service may be | NPPD (days when City's power levels are being exceeded). Minimum bill | ||
| supplied under this rate to multifamily dwellings, apartment houses and | from June-September = Horsepower charge. | ||
| mobile homes. This rate shall not apply to any commercial establishments. | Ancillary charges H2, F1 plus: | ||
| Ancillary charges M2, S1, F1 plus: | 1. All kWh at $0.049 | ||
| 1. Summer, all kWh at $0.077 | |||
| 2. Winter, first 800 kWh at $0.046 | NO CONTROL IRRIGATION | ||
| over 800 kWh at $0.038 | Irrigation system will have power available 100% with exception of power | ||
| outages. Minimum bill June-September = Horsepower charge. | |||
| RURAL | Ancillary charges H3, F1 plus: | ||
| Availability - This schedule is available outside the corporate limits through | 1. All kWh at $0.044 | ||
| a single meter at a single phase secondary voltage for one-family residences | |||
| or their equivalent for all residential uses of electric service. Service may be | WINTER/GRAIN DRYING | ||
| supplied under this rate to multifamily dwellings, apartment houses and | Ancillary charges M4, F1 plus: | ||
| mobile homes. This rate shall not apply to any commercial establishments. | 1. All kWh at $0.057 | ||
| Ancillary charges M3, F1 plus: | |||
| 1. Summer, all kWh at $0.079 | MUNICIPAL WELLS | ||
| 2. Winter, first 800 kWh at $0.047 | Ancillary charges M1 plus | ||
| over 800 kWh at $0.038 | 1. All kWh at $0.053 | ||
| COMMERCIAL | SECURITY LIGHTING | ||
| Availability - This schedule is available through a single meter at a secondary | Type of light Monthly fee | ||
| voltage, either single phase or three phases, for all commercial lighting and | 175 watt mercury vapor lamp $4.65 | ||
| power purposes and for multifamily use. This rate is not available except | 400 watt mercury vapor lamp $11.41 | ||
| where all consumption is measured through a single meter and necessary | 100 watt high pressure sodium vapor lamp $3.27 | ||
| wiring arrangements as required by the City are made by the user. | 150 watt high pressure sodium vapor lamp $5.24 | ||
| Ancillary charges (M4 for single phase or M5 for 3 phase), S2, F1 plus: | 250 watt high pressure sodium vapor lamp $8.01 | ||
| 1. Summer, all kWh at $0.075 | 400 watt high pressure sodium vapor lamp $12.24 | ||
| 2. Winter, first 500 kWh at $0.053 | |||
| over 500 kWh at $0.0485 | GENERAL INFORMATION | ||
| 1. Where metering is on the primary side of supply transformers for | |||
| COMMERCIAL DEMAND | industrial customers, the kilowatts and kilowatt-hours as recorded on the | ||
| Availability - This rate applies to commercial customers whose monthly usage | meter shall be increased by 2% to reflect transformation and line losses. | ||
| exceeds 25,000 kWh for any 4 consecutive months or whose demand | |||
| exceeds 150 kW for 2 consecutive months during the summer period. | 2. The summer period for irrigation covers billings June-September. The | ||
| Ancillary charges M6, S2, F1 plus: | winter period for irrigation covers billings from October-May. The summer | ||
| 1. Summer, demand at $9.00 per kW | period for all other rate types covers billings from June-October. The winter | ||
| 2. Summer, first 20,000 kWh at $0.039 | period for all other rate types covers billings from November-May. | ||
| over 20,000 kWh at $0.033 | |||
| 3. Winter, demand at $5.75 per kW | 3. Load control - Customer has signed a Load Control Agreement form | ||
| 4. Winter, first 20,000 kWh at $0.039 | which will allow the city to install load control equipment on selected | ||
| over 20,000 kWh at $0.031 | compressor and motor loads at their facility. | ||
| COMMERCIAL SPACE AND WATER HEATING | 4. Utility deposits - Each new customer will be required to make a utility | ||
| Availability - (1) Service shall be through a single meter either single phase | deposit when applying for utility service(s). A utility deposit may be waived if | ||
| or three phase. | the customers supplies the city with two letters of reference from previous | ||
| (2) Electric space heating or electric motor operated air | utilities. The deposit amount is $100.00 for residential services, $200.00 for | ||
| conditioning equipment only may be connected. | commercial services, $800.00 for large commercial services and $200.00 for | ||
| Ancillary charges M4, S2, F1 plus: | mobile home services. If a customer account is disconnected for nonpayment | ||
| 1. Summer, all kWh at $0.075 | an additional deposit may be required up to their highest bill. | ||
| 2. Winter, all kWh at $0.041 | |||
| 5. Connection / Reconnection fees - All new accounts will be charged a | |||
| INDUSTRIAL | connection fee at the rate of CE1. Reconnection fees are billed at the rate of | ||
| Availability - Through a single meter for industrial power services. This rate | CE1 for connects made during regular working hours and CE2 for connects | ||
| applies to customers whose monthly usage exceeds 150,000 kWh for any 6 | made outside of regular working hours. | ||
| consecutive months or whose demand exceeds 400 kW for any 3 | |||
| consecutive months. | 6. Late payment fees - If payment is not received within fifteen days of a | ||
| Ancillary charges M7, F1 plus: | bill being rendered a fee of 6% of the amount of the bill will be charged. A | ||
| 1. Summer, demand at $13.50 per kW | bill is considered rendered when it is deposited in the US mail with postage | ||
| 2. Summer, On-peak kWh at $0.022 | prepaid or when delivered to the last known address of the responsible party. | ||
| Off-peak kWh at $0.013 | |||
| 3. Winter, demand at $11.50 per kW | ANCILLARY CHARGES | ||
| 4. Winter, On-peak kWh at $0.017 | CE1 = Connection fee of $35.00 | ||
| 5. Winter, Off-peak kWh at $0.013 | CE2 = Connection fee of $60.00 | ||
| F1 = Franchise fee of 3.0% of total electric bill before taxes | |||
| FULL CONTROL IRRIGATION | H1 = Horsepower charge of $10.00 per connected horsepower per season | ||
| Irrigation system will only be allowed to operate during off-peak hours | H2 = Horsepower charge of $20.00 per connected horsepower per season | ||
| (Mon-Sat 10:00 pm-10:00 am) and all day on Sundays and holidays. | H3 = Horsepower charge of $75.00 per connected horsepower per season | ||
| minimum bill from June-September = Horsepower charge. | M1 = Meter charge of $6.00 per month | ||
| Ancillary charges H1, F1 plus: | M2 = Meter charge of $8.00 per month | ||
| 1. All kWh at $0.043 | M3 = Meter charge of $11.00 per month | ||
| M4 = Meter charge of $12.00 per month | |||
| M5 = Meter charge of $20.00 per month | |||
| M6 = Meter charge of $45.00 per month | |||
| M7 = Meter charge of $200.00 per month | |||
| S1 = Street lighting charge of $1.27 per month | |||
| S2 = Street lighting charge of $3.80 per month | |||